
the building
The first retail address in Selong Belanak.
Selong Belanak is fast becoming one of South Lombok's most in-demand beach town and this commercial venue sits right on the main road, a short walking distance from the beach.
The ground floor holds five individual shop units -each with their own toilet- opening onto a shared, covered corridor and a large parking area at the front. Upstairs, a full-floor restaurant with a large sheltered terrace and a stunning view of Selong belanak’s surrounding hills.
365m²
leasable area
2
floors

3D concept render
the layout
Flexible Spaces, Built Around You
Five ground-floor shops line an alang-alang covered corridor, each with its own toilet and direct street access across the shared parking area. But the layout isn't set in stone — leasing during construction means you can combine two or more adjoining units, open them into one larger space, or reconfigure an entrance to suit your needs. Contact us to discuss the possibilities.

Rent includes water, garbage collection, cleaning and electricity for communal areas. Each tenant will have their own electricity meter.
Shop 1
39m2
Rp 290.000
/m² /month
≈ Rp 11.310.000 / month total
Leased
Shop 2
29m2
Rp 290.000
/m² /month
≈ Rp 8.410.000 / month total
Available
Shop 3
38m2
Rp 290.000
/m² /month
≈ Rp 11.020.000 / month total
Available
Shop 4
38m2
Rp 290.000
/m² /month
≈ Rp 11.020.000 / month total
Available
Shop 5
38m2
Rp 290.000
/m² /month
≈ Rp 11.020.000 / month total
Available
Restaurant
183m2
Rp 210.000
/m² /month
≈ Rp 38.430.000 / month total
Available
availability
Availability & pricing
Rates are quoted per square metre, per month. Adjoining shops can be combined into a single larger lease on request.
terms
What's included
Kept simple: shared building costs are covered in the rent, and each business meters its own power.
Included in rent
💧
Water supply
🗑️
Garbage collection
🧹
Cleaning of communal areas
⚡
Electricity for communal areas
Tenant's responsibility
📋
Business licensing for your operation
🎨
Interior fit-out and signage
⚡
Electricity for your own unit, metered separately
progress
Construction progress
Followed from groundbreaking through to completion in May 2027 — check back for regular site updates.

SITE MARK-OUT — BOUNDARY STAKED

SITE MARK-OUT — BOUNDARY STAKED